Agency News

India News | Indian Railways Approves Rs 170 Cr for Kavach 4.0 on Remaining 712 Rkm of Moradabad Division

Get latest articles and stories on India at LatestLY. Kavach is an indigenously developed Automatic Train Protection (ATP) system designed to enhance operational safety. It helps prevent Signal Passing at Danger (SPAD), automatically applies brakes when required to avert unsafe situations, controls train speed in critical conditions, and significantly reduces the risk of collisions.

India News | Indian Railways Approves Rs 170 Cr for Kavach 4.0 on Remaining 712 Rkm of Moradabad Division
Railways Minister Ashwini Vaishnaw (File photo/ANI)

New Delhi [India], September 1 (ANI): Indian Railways has approved the provision of Kavach Version 4.0 on the remaining sections covering 712 route kilometres (Rkm) of Moradabad Division, Northern Railway, at a total cost of Rs 170 crore.

The approved work will strengthen the division's railway safety infrastructure through the deployment of the indigenous Automatic Train Protection system, the Railways Ministry stated. The implementation of Kavach 4.0 will provide an advanced safety layer for train operations across the identified sections.

Also Read | Kerala Lottery Result Today 3 PM Live, Sthree-Sakthi SS-535 Lottery Result of September 1, 2026, Watch Lucky Draw Winner List.

Kavach is an indigenously developed Automatic Train Protection (ATP) system designed to enhance operational safety. It helps prevent Signal Passing at Danger (SPAD), automatically applies brakes when required to avert unsafe situations, controls train speed in critical conditions, and significantly reduces the risk of collisions, a release said.

The initiative forms part of Indian Railways' continued efforts to expand Kavach coverage across its network and modernise railway signalling and train protection systems.

Also Read | Bhopal: Woman Leaves Toddler With Youth for 15 Minutes, He Kidnaps and S*xually Assaults Child.

In July, Railways Minister Ashwini Vaishnaw informed the Lok Sabha that Kavach Version 4.0 has been successfully commissioned on 2,633 route kilometres as of July 31.

The deployment covers 1,423 route km on the Delhi-Mumbai corridor and 1,210 route km on the Delhi-Howrah corridor. "Kavach Ver. 4.0 is planned for large-scale deployment over Indian Railways," the reply said.

According to the reply, trackside Kavach implementation work has been taken up on 21,794 route kilometres covering the entire Golden Quadrilateral, Golden Diagonal, High Density Network, and other identified sections of Indian Railways.

The government said key components installed under the Kavach programme include 11,547 km of optical fibre cable, 1,721 telecom towers, station data centres at 1,009 stations, trackside equipment covering 7,726 route kilometres and Kavach systems installed in 6,290 locomotives. Work has also been taken up to equip another 7,190 locomotives and 1,200 EMU/MEMU trains with the system. (ANI)

(The above story is verified and authored by ANI staff, ANI is South Asia's leading multimedia news agency with over 100 bureaus in India, South Asia and across the globe. ANI brings the latest news on Politics and Current Affairs in India & around the World, Sports, Health, Fitness, Entertainment, & News. The views appearing in the above post do not reflect the opinions of LatestLY)