Rescue workers continued clearing slush, metal, and other debris from the last 50-70 meters of the 14-kilometer tunnel. At the D1, one of the points where the Human Remains Detection Dog (HRDD) squad from Kerala and the ground probing radar (GPR) have detected some human remains, and soft material, debris to a height of nine meters have piled up.