News

⚡Gujarat: 9th Steel Bridge Completed for Mumbai-Ahmedabad Bullet Train Project

By IANS

This makes it the ninth steel bridge completed out of the 17 planned in the state. The first 100-metre span of the bridge was launched in April 2025. Together, the two spans form a 200-metre-long structure weighing 2,884 metric tonnes, with a height of 14.6 metres and a width of 14.3 metres.

Read Full Story
Read All QuickLY