News

⚡RIL to Start Natural Gas Production from MJ Field in October-December 2022

By PTI

The MJ-1 gas find is located about 2,000 metres directly below the Dhirubhai-1 and 3 (D1 and D3) fields - the first and the largest fields in KG-D6 block. MJ-1 is estimated to hold a minimum of 0.988 Trillion cubic feet (Tcf) of contingent resources. The field also has oil deposits which would be produced using a floating system, called FPSO.

Read Full Story