India News | First Coal Rake Gets Loaded and Dispatched from Dharamjaigarh Freight Terminal, Developed by CERL

Get latest articles and stories on India at LatestLY. The first coal rake was loaded and dispatched from the Dharamjaigarh freight terminal of Chhattisgarh East Railway Limited (CERL), a subsidiary of South Eastern Coalfields Limited (SECL) for NTPC-SAIL Power Company Limited (NSPCL), Bhilai on Saturday.

First coal rake gets loaded and dispatched from the Dharamjaigarh freight terminal, developed by CERL (Photo/ANI)

Raigarh (Chhattisgarh) [India], March 26 (ANI): The first coal rake was loaded and dispatched from the Dharamjaigarh freight terminal of Chhattisgarh East Railway Limited (CERL), a subsidiary of South Eastern Coalfields Limited (SECL) for NTPC-SAIL Power Company Limited (NSPCL), Bhilai on Saturday.

CERL is developing a rail corridor in the state of Chhattisgarh to primarily facilitate coal evacuation from the coalfields located at Chhattisgarh. It will generate additional coal loading potential to the tune of 3 rakes per day. The coal is loaded on RCR (Road-cum-Rail) mode from the Jhampali mine of SECL.

Also Read | Odisha Civic Polls: BJD Sweeps Municipal Election, Wins 95 Out of 108 Civic Bodies.

Kharsia to Dharamjaigarh (74 Km) of mainline and Gharghoda to Bhalumuda (13.5 Km) of spur line has already been commissioned by CERL in South East Central Railway (SECR) zone. The project is being developed under PPP Model and the total project cost of the CERL Project is Rs 3,055 crores. (ANI)

(The above story is verified and authored by ANI staff, ANI is South Asia's leading multimedia news agency with over 100 bureaus in India, South Asia and across the globe. ANI brings the latest news on Politics and Current Affairs in India & around the World, Sports, Health, Fitness, Entertainment, & News. The views appearing in the above post do not reflect the opinions of LatestLY)

Share Now

Share Now