- Home
- Bullet Train Project
BULLET TRAIN PROJECT
Mumbai-Ahmedabad Bullet Train Project Update: 343 KM Viaduct, 5 KM of Key Tunnel Excavation Completed
Mumbai-Ahmedabad Bullet Train Project: 100-Metre Long ‘Make in India’ Steel Bridge Completed Over Underground Metro Tunnel in Ahmedabad
Mumbai-Ahmedabad Bullet Train Project Update: First Mountain Tunnel Breakthrough in High-Speed Train Corridor Achieved in Maharashtra’s Palghar (Videos)
Mumbai-Ahmedabad Bullet Train Project Update: Railway Minister Ashwini Vaishnaw Inspects Project Site in Gujarat, Says 'Surat-Bilimora Section To Be Operational in 2027' (Watch Videos)
Mumbai-Ahmedabad Bullet Train Project Update: Railway Minister Ashwini Vaishnaw Interacts With Workers After Train Tunnel Breakthrough With New Austrian Tunnelling Method (Watch Videos)
Mumbai-Ahmedabad Bullet Train Project: 9th Steel Bridge Completed for Speed Train Project in Gujarat
Mumbai-Ahmedabad Bullet Train Project Update: Stations Part of Speed Train Corridor Nearing Completion, Says Railway Ministry
Mumbai-Ahmedabad Bullet Train Project Update: Work on MAHSR Project Is in Full Swing With Foundation Work Already Completed Across 406 KM, Railway Minister Ashwini Vaishnaw Informs Parliament
Mumbai-Ahmedabad Bullet Train Project Update: Entire Project From Maharashtra to Gujarat's Sabarmati Expected To Be Ready by 2029, Says Railway Minister Ashwini Vaishnaw
Will Japanese Bullet Train Not Run Between Ahmedabad and Mumbai? PIB Fact Check Debunks Fake News of Replacing Shinkansen With Vande Bharat Train
Mumbai-Ahmedabad Bullet Train Project Update: First Section of 21-Km Undersea Tunnel Opens Between Ghansoli and Shilphata in Maharashtra, Japan Agrees To Introduce E10 Shinkansen Trains (See Pics)
Gujarat: Accident at Bullet Train Project Site Near Ahmedabad As Gantry Skids From Its Position; Several Trains Cancelled, Rescheduled (Watch Videos)
Mumbai-Ahmedabad Bullet Train Project: 386 Km of Pier Foundation and 272 Km Viaduct Work Done, Track Laying Yet To Start
Mumbai-Ahmedabad Bullet Train Project: Ashwini Vaishnaw Says 360 Km of Bullet Train Project Complete; Blames Uddhav Thackeray for Delay
Mumbai-Ahmedabad Bullet Train Project Picks Pace With 100-Metre-Long Steel Bridge Construction in Gujarat’s Surat (Watch Video)
Mumbai-Ahmedabad Bullet Train Project: Foundation Work of Eight Stations for Bullet Train Completed in Gujarat
Bullet Train Project Update: First Section of Bullet Train To Be Operational Within Three Years, Ayodhya Airport by December End, Says Union Minister Jyotiraditya Scindia
Kylian Mbappe Highlights Forehead Injury Inflicted in Real Madrid vs Girona La Liga 2026 Match, Shares Pic on IG
Tamil Nadu Assembly Elections 2026: CM MK Stalin Pitches ‘Dravidian Model 2.0’, Seeks Fresh Mandate in Upcoming Polls
Como vs Inter Milan, Serie A 2025–26 Free Live Streaming Online
Vijay’s ‘Jana Nayagan’ Leak: Tamil Nadu Police Arrest 6 in Major Crackdown on Film Piracy Case
Krunal Pandya New Hairstyle: Star All-Rounder Debuts Braided Look During MI vs RCB IPL 2026 Match
‘Deadly Whirlpools’: Iran’s Revolutionary Guards Warn US As Donald Trump Orders Naval Blockade of Strait of Hormuz
Read More
West Bengal Assembly Elections 2026: PM Narendra Modi To Address Mega ‘Vijay Sankalp Sabha’ in Siliguri Today
‘Bad News That We Have Not Reached Agreement’: JD Vance Says No Deal in US-Iran Talks (Watch Video)
Why Iran’s Hormuz Island Turns Blood-Red After Rains
Amroha Shocker: Parents Follow Tantrik’s Advice, Lower Snakebite Victim in River Ganga for 12 Hours; Teen Dies (Disturbing Video)
Earthquake in Jammu and Kashmir: Quake of Magnitude 4.6 on Richter Scale Jolts Doda District
Andhra Pradesh Inter Result 2026: Know How To Check Class 12 Scorecard Online
-
West Bengal Assembly Elections 2026: PM Narendra Modi To Address Mega ‘Vijay Sankalp Sabha’ in Siliguri Today
-
‘Bad News That We Have Not Reached Agreement’: JD Vance Says No Deal in US-Iran Talks (Watch Video)
-
Amroha Shocker: Parents Follow Tantrik’s Advice, Lower Snakebite Victim in River Ganga for 12 Hours; Teen Dies (Disturbing Video)
-
Earthquake in Jammu and Kashmir: Quake of Magnitude 4.6 on Richter Scale Jolts Doda District













Quickly
