News
The Assam Cabinet Approved Assam Bridge Project-II. It is a 4.08 Km Long Four-lane Extra ... - Latest Tweet by ANI
The latest Tweet by ANI states, 'The Assam cabinet approved Assam Bridge Project-II. It is a 4.08 km long four-lane extra dosed PSC bridge over the Brahmaputra river connecting Palasbari and Sualkuchi at a cost of Rs 3,197 crore: Assam Health Minister Keshab Mahanta '
The Assam cabinet approved Assam Bridge Project-II. It is a 4.08 km long four-lane extra dosed PSC bridge over the Brahmaputra river connecting Palasbari and Sualkuchi at a cost of Rs 3,197 crore: Assam Health Minister Keshab Mahanta (03.05)— ANI (@ANI) May 3, 2022
(The above story first appeared on LatestLY on May 04, 2022 01:13 AM IST. For more news and updates on politics, world, sports, entertainment and lifestyle, log on to our website latestly.com).