India News | Uttarkashi Tunnel Collapse: Rescue Operation at Critical Stage, Medical Equipment Reach Silkyara Site

Get latest articles and stories on India at LatestLY. According to officials, the workers are expected to be pulled out from the collapsed tunnel today.

Visuals from the spot (Photo/ANI)

Uttarkashi (Uttarakhand) [India], November 23 (ANI): Medical equipment reached the site as efforts to rescue 41 workers trapped inside the Silkyara tunnel in Uttarkashi continued on the 12th day on Thursday.

According to officials, the workers are expected to be pulled out from the collapsed tunnel today.

Also Read | Uttarkashi Tunnel Collapse: Laying of 12-Metre Pipeline Still Left at Silkyara Tunnel to Rescue 41 Trapped Workers (Watch Videos).

The workers have been trapped since November 12, when the under-construction tunnel from Silkyara to Barkot got blocked due to debris falling in a 60-meter stretch on the Silkyara side.

The operation to rescue 41 workers trapped inside a Uttarakhand tunnel for the past 12 days is in its critical phase.

Also Read | PM Narendra Modi Writes Open Letter to Rajasthan Voters Ahead of Polling, Alleges Congress Govt Caused Irreparable Damage to State’s Reputation (Full Text).

As of midnight, rescue teams had said that about 10 metres of debris separated them from the trapped workers.

According to rescue teams, the operation involved drilling through the debris to push wide pipes for the trapped workers to walk out through. The auger machine, which drills through about 3 metres of debris in an hour, had earlier hit a metal obstruction.

A 41-bed hospital readied at the Community Health Centre in Chinyalisaur for medical examination and care of trapped workers after they are evacuated from the Silkyara tunnel in Uttarkashi.

Rescue workers said the workers would go through a detailed medical examination once they reached the hospital.

Earlier in the night, NDRF personnel also carried oxygen cylinders at Uttarkashi's Silkyara tunnel to assist in the ongoing rescue operation.

The area of entrapment, measuring 8.5 meters in height and 2 kilometres in length, is the built-up portion of the tunnel, offering safety to the labourers with available electricity and water supply. (ANI)

(The above story is verified and authored by ANI staff, ANI is South Asia's leading multimedia news agency with over 100 bureaus in India, South Asia and across the globe. ANI brings the latest news on Politics and Current Affairs in India & around the World, Sports, Health, Fitness, Entertainment, & News. The views appearing in the above post do not reflect the opinions of LatestLY)

Share Now

Share Now