Latest News | Power Supply to Factory Cut

Get latest articles and stories on Latest News at LatestLY. : Due to non-operation of an effluent treatment plant at a textile bleaching and printing unit here, electricity supply to the factory was disconnected on Saturday. According to the Pollution Control Board (PCB), the unit did not operate the treatment plant and allowed the untreated effluent into drains to merge with the water courses.

Erode (TN) Feb 12 (PTI): Due to non-operation of an effluent treatment plant at a textile bleaching and printing unit here, electricity supply to the factory was disconnected on Saturday. According to the Pollution Control Board (PCB), the unit did not operate the treatment plant and allowed the untreated effluent into drains to merge with the water courses.

Also Read | Indian Railway Recruitment 2022: Apply for 756 posts in East Coast Railway RRC Bhubaneshwar at rrcbbs.org.in; Check Details here.

The PCB officials sent a report to the District Collectorate in this regard and the order to disconnect the power supply to the unit was issued.

Also Read | Goa Assembly Elections 2022: Know How To Check Name in Voter List and Download Voter Slip.

(The above story is verified and authored by Press Trust of India (PTI) staff. PTI, India’s premier news agency, employs more than 400 journalists and 500 stringers to cover almost every district and small town in India.. The views appearing in the above post do not reflect the opinions of LatestLY)

Share Now

Share Now